| LNG Storage Capacity |
320,000 cubic meters (m3 ) (6.4 Billion Cubic Feet
(Bcf))
Two - 160,000 m3 tanks
Full Containment Design
|
| Regasification Capacity |
1.0 Bcf per day |
| Pipeline Interconnections |
0.05 Bcf per day - Existing Coos County Pipeline via NW Natural
1.00 Bcf per day - New Pacific Connector Gas Pipeline |
| Power Facilities |
37 MW Co-generation plant
Full redundancy through interconnection with Pacific Power |
| Natural Gas Liquids (NGL) Extraction |
Capable of conditioning natural gas to meet regional transportation specifications |
| Marine Facilities |
Design will accommodate LNG carriers
up to 160,000 m3 |