About The Project -  Terminal Configuration & Design Specifications
 
Click on image for larger version
LNG Storage Capacity

320,000 cubic meters (m3 ) (6.4 Billion Cubic Feet (Bcf))
Two - 160,000 m3 tanks
Full Containment Design

Regasification Capacity 1.0 Bcf per day
Pipeline Interconnections

0.05 Bcf per day - Existing Coos County Pipeline via NW Natural
1.00 Bcf per day - New Pacific Connector Gas Pipeline

Power Facilities

37 MW Co-generation plant
Full redundancy through interconnection with Pacific Power

Natural Gas Liquids (NGL) Extraction Capable of conditioning natural gas to meet regional transportation specifications
Marine Facilities Design will accommodate LNG carriers up to 160,000 m3